Case Study · Aerospace × Advanced analytics

Production planner at Airbus.

The need to increase the company’s performance and productivity.

An optimisation engine proposes an easily updated schedule and structures the operations, assigning them to workers with the right skills.

Client

Airbus

Scope

Airbus A400M Atlas programme

Approach

Advanced analytics

Focus

Production scheduling

Gallery

Problem

Higher output.
Higher productivity.

The need to increase the company’s performance and productivity.

Performance and productivity, across the programme.

Solution

An optimisation engine.
A schedule that updates easily.

Provide an optimisation engine to propose an easily updated schedule, and to structure the operations and assign them to workers with the right skills within the Airbus A400M Atlas programme, through advanced analytics.

Operations assigned to the right skills.

Impact

What advanced analytics delivered

01

Planning time cut drastically

The solution drastically reduced the time spent on planning.

02

Programmes harmonised

All Airbus aircraft programmes were harmonised, covering all business and IT needs.

At a glance

Airbus · Production planner

Problem: the need to increase the company’s performance and productivity.

Solution: an optimisation engine proposing an easily updated schedule, structuring the operations and assigning them to workers with the right skills within the Airbus A400M Atlas programme.

Impact: drastically reduced planning time and harmonised all Airbus aircraft programmes, covering all business and IT needs.

Airbus

About the client

Airbus

Airbus designs and manufactures aircraft across commercial, defence and space programmes. The work described here was carried out within the A400M Atlas military transport programme.

Aerospace · A400M Atlas programme

Production planning across programmes? Let’s talk.